Apr 19, 2024  
2010-2011 Academic Catalog 
    
2010-2011 Academic Catalog [Published Catalog]

Add to Portfolio (opens a new window)

CENG 449 - Systems Analysis for Construction Engineering


Introduction to the basic construction systems. The systems analysis approach; multi-objective problems. Decision analysis; decision making under uncertainty, risk aversion, utility function. Economic considerations for resource allocation; minimum cost model, maximum output model. Sensitivity analysis; changes in unit costs, changes in resource constraints. Information management systems.
Prerequisites
Prerequisites: ENGR 313, CENG 446.
When Offered
Offered occasionally.
(3 cr.)



Add to Portfolio (opens a new window)