|
Feb 05, 2025
|
|
|
|
PENG 000/4125 - Advanced Well Construction (3 cr.)
Prerequisites PENG 4121
Description Advanced well planning; rig selections; well cost estimation; advanced well design of horizontal and multi-lateral wells; deep water drilling techniques; HPHT wells; drilling operations optimizations; well control predictions and solutions (e.g. relief wells); cement evaluation; advanced geo-steering design and operations; drilling software.
When Offered Offered occasionally
Check course scheduling information
Add to Portfolio (opens a new window)
|
|