|
Dec 26, 2024
|
|
|
|
PENG 411/4121 - Drilling Engineering II (3 cr.)
Prerequisites
Description Rig systems; advanced drilling tools; well control and BOP equipment and calculations; casing design; cementing calculations and operations; bits design; well drilling operations techniques and process optimization for directional drilling, horizontal drilling, multilateral drilling; predicting and over-coming drilling problems (e.g. hole stability, lost circulation, swelling, kicks, etc.); controlled drilling, geo-steering; offshore drilling; well survey; MWD and LWD tools; well trajectory calculations.
When Offered Every other semester.
Check course scheduling information
Add to Portfolio (opens a new window)
|
|