Sep 07, 2024  
2015-2016 Academic Catalog 
    
2015-2016 Academic Catalog [Published Catalog]

Add to Portfolio (opens a new window)

PENG 321/3310 - Well Completion and Workover (3 cr.)



Prerequisites
PENG 3111  

Description
Introduction and definition of well completion and workover, Types of completions and pros and cons of each type (OH, CH, CH cemented, Linear, ….etc), Surface (SWHs) and Downhole components of completions (equipment) (tbg, packers, bridge plugs, SSDs, SSSV, SCSSV, …etc) including the tubing design calculations, Coiled tubing/Wireline and coiled tubing operations, Stimulation (frac, acidizing and acid fracs), carbonate and sandstone acidizing, Perforation, Sand control/gravel pack, Formation damage, Workover fluid, Design completion of directional wells, Well completion economics, Lift systems.

When Offered
Offered in fall.


Check course scheduling information




Add to Portfolio (opens a new window)