|
Dec 26, 2024
|
|
|
|
PENG 321/3310 - Well Completion and Workover (3 cr.)
Prerequisites PENG 3111
Description Introduction and definition of well completion and workover, Types of completions and pros and cons of each type (OH, CH, CH cemented, Linear, ….etc), Surface (SWHs) and Downhole components of completions (equipment) (tbg, packers, bridge plugs, SSDs, SSSV, SCSSV, …etc) including the tubing design calculations, Coiled tubing/Wireline and coiled tubing operations, Stimulation (frac, acidizing and acid fracs), carbonate and sandstone acidizing, Perforation, Sand control/gravel pack, Formation damage, Workover fluid, Design completion of directional wells, Well completion economics, Lift systems.
When Offered Every other semester
Check course scheduling information
Add to Portfolio (opens a new window)
|
|